Culina v Timilty Constructions PL

Table of Contents

Case Overview

The case of Culina v Timilty Constructions PL (2022) NSWCATCD 109 was decided on 23 June 2022 by the Civil and Administrative Tribunal of New South Wales, presided over by G K Burton SC, Senior Member. The tribunal focused on a residential building dispute involving allegations of defective work, specifically relating to waterproofing and drainage issues.

Project Details

This case involved a duplex construction project located in Burraneer, a southern suburb of Sydney. The key details include:

  • Original contract price: $1,311,848.34
  • Type of residential work: Duplex construction
  • Contract type: HIA Contract
  • Contractual completion date: 03 April 2019
  • Actual completion date: 07 May 2019

Parties Involved

The parties in this dispute were:

  • Homeowner: Dean Culina (Self-represented)
  • Builder: Timilty Constructions PL (represented by M Timilty, Director)

Nature of the Dispute

The dispute arose from allegations of defective waterproofing work and other related issues. Specifically, the case revolved around several claims of defects:

  • Water ingress from the planter box
  • Water ingress from the louvred window
  • Water ingress from the sliding stack door
  • Water ingress from the north wall of the kitchen and living areas
  • Water egress from the planter box
  • Water ponding on roof sheeting
  • Northern box gutter issues
  • Wet area tiled strip drains

Claim Details

The homeowner filed a claim on 06 May 2021, seeking less than $30,000 for the alleged waterproofing defects. The specific remedies sought included:

  • A monetary order for defective waterproofing work

Key Findings

The tribunal found that:

  • The builder was liable for numerous defects identified, classifying them as major defects.
  • Significant evidence from expert reports supported the homeowner’s claims, highlighting deficiencies in waterproofing and other construction standards.
  • The tribunal determined that the allegation of previous rectification presented by the builder was not accepted.

Outcome

The decision favoured the applicant (Dean Culina), resulting in:

  • Remedies ordered: A monetary order of $61,012.08 payable by Timilty Constructions PL on or before 21 July 2022.
  • Cost considerations: Each party was to bear their own costs for the proceedings, pending further submissions on the costs involved.

Key Sections and Interpretation of the Home Building Act and Relevant Case Precedents

The tribunal’s interpretation of Section 18B emphasised that:

  • Defective work must be rectified by the builder in accordance with the statutory warranties.
  • Homeowners have the right to seek remedies if these standards are violated.

The case drew on precedents such as Bellgrove v Eldridge, establishing key legal principles regarding damages for breach of contract.

Take Warranty
Wisdom into Action

Use HBApp to apply legal insights 
to your home project

Need Expert Advice on Your Building Dispute?

While our case summaries provide valuable insights, every building dispute is unique.

Get personalised guidance from a qualified professional.

Begin Your Journey to a Dream Home Today

Ready to transform your home building experience? Sign up for a free trial and unlock the full potential of Home Building App. Discover how our comprehensive project management tools can simplify your build, ensuring your project remains on time, within budget, and of the highest quality.